Analytical and Approximate Variance of Public Building Total Project Cost, Estimation by Mean Component Costs Method

Analytical and Approximate Variance of Public Building Total Project Cost, Estimation by Mean Component Costs Method

Analytical and Approximate Variance of Public Building Total Project Cost, Estimation by Mean Component Costs Method

 

Quick Navigation for Final Year Undergraduates, Masters (Thesis), and Ph.D. Dissertation Students Who Need Our Services on Their Research Works

Find More Project TopicsFIND HERE
Hire Us for Thesis WorksHIRE NOW
Hire Us for Project WorksHIRE NOW
Hire Us for Seminar WorksHIRE NOW
Hire Us for AssignmentsHIRE NOW
Hire Us for ProposalsHIRE NOW
Contact  UsHERE NOW

 

DOWNLOAD FULL PDF WORK

 

Abstract on Analytical and Approximate Variance of Public Building Total Project Cost, Estimation by Mean Component Costs Method

Building construction project has become an everyday issue, and this involves the spending of hard earned money by the project owner called the client. The expectation of the owner of any building project is justification of good project delivery. This is enabled by the objectives of the project which definitely includes project cost that envelopes the cost and quality of delivery at the expected time. The major issue, is the project cost which dictates its success. Project cost variance has been affecting the speedy and successful delivery of building construction projects. The key fact in this study method was to collect and analyse public building project cost estimates containing building components, which includes preliminaries, substructure, superstructure, mechanical/electrical, external works and contingency in the bill of quantity (BOQ) from projects handled by Education Trust Fund(ETF) in the tertiary institutions located in Kaduna, Kwara, Kogi and Abuja from 2009 to 2010. The study adopted mean component cost method modeled by Skitmore and Ng (2002) to determine the projected cost variance of the Lecture Theatres and Lecture Rooms handled by the organization in various tertiary institutions in Nigeria. The analysis of the data collected was made by using standard method of analysis which employs SPSS for the project costs.Skitmore and Ng (2002) model was employed to test the variability of the project cost data. The result shows that; the building component cost data 4782.50 had closer link to the mean 4773.92(mean) for preliminaries component column in project ID 4 of Lecture Theatreandanother component data 2797.62 is also close to 2312.91(mean) for Ext.Wkscolumn in project ID 7 for the Lecture Theatre building projects butfor the Lecture Classrooms building the preliminaries column had 1531.41 and 1416.33(mean) in project ID 2 and 1611.22 and 1673..58(mean) for M/E column for project ID 5. This project therefore concludes in addition to the results of the cost variances, that the lecture theatre and classrooms projects are underestimated.Interview was also conducted on the professional estimators in building industry. Moreover significant differences exist among the components in those public buildings.The analytical calculation shows that the correct variance for an average lecture theatre project from this research was found to be 34.73%. The sample analyzed had shown that the correct variance of the class room was found to be 38. 50%. Therefore lecture theatre is observed to be a better building project than the class room building. The study recommends the need to minimize the occurrence of the overrun by thoroughly crosschecking the initial estimate and addressing other technical issues before the contract is awarded. It also recommends the employment of the mean component cost method of analysis and setting of a committee to properly scrutinize the estimate.

                          

Chapter One of Analytical and Approximate Variance of Public Building Total Project Cost, Estimation by Mean Component Costs Method

INTRODUCTION

Background of the Study

In the building construction industry, it is a formal procedure to determine the initial cost of a building project before awarding the contract. This is in order to ascertain the financial level of the client whether the project is worth undertaking. The underlyingfact is because of the instability of the market prices of material, labour and equipment which are the major tools involved in the construction.
The wave of project production cost variability in the recent time calls for a concern in the building industry. If a building project cost estimate is presented for tender and the contractor gives his quotations, with all necessary adjustment made and contract is awarded, it is not likely that the agreed contract price will still be the final project cost at completion. The final project cost is often found to be higher at completion.
There are many factors leading to the changes in the final cost. Giwa (1998) had stated that the effect of change between the initial and the final cost incurred constitute a major problem in the building industry, especially between the client and estimator. This cost differential is called cost variance in the building construction industry. Cost variance is significant for general cost planning, and can be a big problem to solve by the managers in the building industry.

 

DOWNLOAD FULL PDF WORK

Disclaimer

This research material is intended for academic use only and should be used as a guide in constructing your research project and seminar presentation. You should never duplicate the content word for word (verbatim), as SCHOOLTHESIS.COM will not be held liable for anyone who does.

The purpose of publishing this material is to alleviate the stress of hopping from one school library to the next in search of research materials. This service is lawful because all educational institutions allow students to read past projects, papers, books, and articles while working on their own.

SCHOOL THESIS is merely giving this information as a research reference. Use the document as a reference or structure for your own research paper. This paper’s content should be able to assist you in coming up with new ideas and thoughts for your own study

Analytical and Approximate Variance of Public Building Total Project Cost Estimation by Mean Component Costs Method research paper, should only be used as a guide.

Similar Posts